Solar PV Plant Financial Feasibility (Standalone)

Financial Input Parameters

[The useful life of a Solar PV plant is usually ~25 years. Type 25 for 25 years, 20 for 20 years and so on.]



[For a plant of rating 100 kWp, enter 100. This is used for O&M cost calculation.]



[Enter the annual degradation rate after the first year. e.g., 0.5 for 0.5%]



[Enter the total initial cost of the project.Maintain the consistency of the currency i.e.; if you choose 'Rs' as currency for capex, use the 'Rs' currency for remaining inputs as well.]



[Enter the estimated salvage value as a percentage of Capital Cost at the end of plant life. e.g., 5 for 5%]



[Enter the price at which electricity is sold.]



[Enter the annual depreciation rate. e.g., 15 for 15%.]



[Enter the number of years the Written Down Value (WDV) method is applied before switching to straight-line depreciation.]



[Enter the operation and maintenance cost per kWp of DC rating for the first year.]



[Enter overheads as a percentage of O&M cost. e.g., 5 for 5%]



[Enter management fee as a percentage of O&M cost. e.g., 2 for 2%]



[Enter the annual escalation rate for O&M costs. e.g., 5 for 5%]



[Enter the Debt to Equity ratio. e.g., (70/30 =2.33) for 70% debt, 30% equity]



[Enter the annual interest rate on debt. e.g., 10 for 10%]



[Enter the number of years over which the debt is repaid.]



[Enter the annual insurance premium as a percentage of the depreciated project cost for the year. e.g., 1 for 1%]



[Enter the applicable corporate tax rate. e.g., 25 for 25%]



[Enter the desired AC energy output for the first year. Backend will calculate subsequent years using Plant Life and Degradation.]



[Enter the desired rate of return for equity investors directly. e.g., 12 for 12%]